{"id":84,"date":"2018-07-31T11:32:01","date_gmt":"2018-07-31T09:32:01","guid":{"rendered":"https:\/\/www.kia-holding.com\/?page_id=84"},"modified":"2018-10-25T11:52:56","modified_gmt":"2018-10-25T09:52:56","slug":"beteiligung-erneuerbare-energien","status":"publish","type":"page","link":"https:\/\/www.kia-holding.com\/en\/aktivitaeten-weltweit\/beteiligung-erneuerbare-energien\/","title":{"rendered":"Participation in renewable energies"},"content":{"rendered":"<p>We participate in existing and newly-developed solar and wind parks as well as hydropower plants<\/p>\n<p><strong>Geography:<\/strong> In the countries marked on the <a href=\"https:\/\/www.kia-holding.com\/en\/aktivitaeten-weltweit\/\">world map<\/a>.<\/p>\n<p><strong>Development status:<\/strong> Existing locations or those with completed project development (ready-to-build status). Feed-in remuneration agreements with the respective state or long-term purchase agreements with companies with strong credit ratings are in place. Maturities of at least 15 years.<\/p>\n<p>The following documents are required for a preliminary inspection:<\/p>\n<ul>\n<li>Location of the project<\/li>\n<li>Rated power<\/li>\n<li>Specific yield\/full load hours<\/li>\n<li>Project developer\/General contractor<\/li>\n<li>Component manufacturers<\/li>\n<li>Grid connection\/construction progress<\/li>\n<li>Purchase price<\/li>\n<li>Electricity yield according to expert opinion<\/li>\n<li>Feed-in remuneration<\/li>\n<li>Technical operating costs<\/li>\n<li>Lease or land costs<\/li>\n<li>Insurance quotation<\/li>\n<li>Financing quotation<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>We participate in existing and newly-developed solar and wind parks as well as hydropower plants Geography: In the countries marked on the world map. Development status: Existing locations or those with completed project development (ready-to-build status). Feed-in remuneration agreements with the respective state or long-term purchase agreements with companies with strong credit ratings are in place. Maturities of at least 15 years. The following documents are required for a preliminary inspection: Location of the project Rated power Specific yield\/full load&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":11,"menu_order":60,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-84","page","type-page","status-publish","hentry"],"translation":{"provider":"WPGlobus","version":"3.0.2","language":"en","enabled_languages":["de","en","es","pt"],"languages":{"de":{"title":true,"content":true,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false},"es":{"title":true,"content":true,"excerpt":false},"pt":{"title":true,"content":true,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/pages\/84","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/comments?post=84"}],"version-history":[{"count":8,"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/pages\/84\/revisions"}],"predecessor-version":[{"id":263,"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/pages\/84\/revisions\/263"}],"up":[{"embeddable":true,"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/pages\/11"}],"wp:attachment":[{"href":"https:\/\/www.kia-holding.com\/en\/wp-json\/wp\/v2\/media?parent=84"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}